It’s been a long, hard week…

…because I am still painting walls, thanks to the building management who provided the cheapest, chalkiest paint…which does not contain enough Titanium Dioxide to cover very well!

Both the bath and kitchen will require a second coat, while most of the other walls have taken FOUR coats, in addition to the original stain-blocker coat, and the ceiling in the bed area needs a second coat for sure, and hopefully not a third…I really expect to be finished, cleaned up and redecorated by Hallowe’en!

It hasn’t been as easy as it was in the ‘olden days’, when I could climb for hours or paint a room’s ceiling in fifteen minutes (including the cutting in!)…nor can I even climb every day, for that matter.

It’s been long, but (hint-hint to the building management!) could have been accomplished in one, maybe two, coats had the paint been of a better quality, but alas, they are known to be ‘penny-wise and pound-foolish’!

In between the painting, I managed to take hundreds of images of the demolition of the Shambhala Meditation Center next door…which, of course, I haven’t been able to do anything with just yet.

However, I can show you yesterday’s pix, taken at the end of a very long workday for the meticulous, hard-working crew involved.

I’ll call this “The Sham-Gone” series!

The day had been spent sifting and sorting, as huge dump trucks came and went with load after load of broken-up concrete and very sandy subsoil (this area actually used to be Lake Michigan before it was filled in many decades ago--hence, the sand...

The day had been spent sifting and sorting, as huge dump trucks came and went with load after load of broken-up concrete, various metals and extremely sandy subsoil (this area actually used to be Lake Michigan before it was filled in many decades ago–hence, the sand…

...and more sand...

…and more sand…

...and, even more sand!).

…and, even more sand!).

The crew is finished for now, so I guess the next crew will be taking down the trees.

The crew is finished for now, so I guess the next crew will be taking down the trees.

Though that may seem sad to some of you, it’s actually a good thing, as the owners of Shambhala were not very wise stewards, especially in maintaining the trees.

Lots of broken limbs and dead/dying stock littered this property…and a number of trees were allowed to sprout naturally, but were never regularly pruned to allow them space to grow well.

In addition, most of the trees had very shallow roots due to the sandy subsoil, so that as they aged, the potential for crashing down became greater with each passing year.

* * *

I had spoken several times with the crew (mainly the shovel operator and his two assistants), telling them I thought they had done an excellent job.

Though they were all a little embarrassed at being praised, one assistant piped up,

“Well, at least somebody appreciates what we do!”

Advertisements

Demolition Day #2

Shambhala-1

The demolition crew returned Saturday around noon to continue the tear-down of what was known as the Shambhala Meditation Center.

Here are some images of what they accomplished in four short hours:

Sham-1

*

Sham-4

*

No idea why this Chicago Police Sergeant stopped in...perhaps he needed directions?

No idea why this Chicago Police Sergeant stopped in…perhaps he needed directions?

*

The shovel man switched to using this huge claw in order to pull down brick walls.

The shovel man switched to using this huge claw in order to pull down brick walls…

*

Sham-26…and the constant stream of water kept down the dust.

*

The claw also worked well in dismantling the roof...

The claw also worked well in dismantling the roof…

*

Sham-43…and the many interior walls.

The structure was once considered a ‘Sheridan Road mansion’, but had been so carved up into various little rooms inside, some of which had those wonderful ‘drop ceilings’–sorry, I couldn’t resist a bit of sarcasm;  I’m one of those people who wish ‘drop ceilings’ had never been invented–they are soooo ugly!

I went down to ground level on my lazy Sunday afternoon and took many more shots…here are a few:

Sham-Day 2-1

*

???????????????????????????????

*

Sham-Day 2-3

*

Sham-Day 2-4

Not bad, for a Saturday afternoon’s work and, surprisingly, there wasn’t nearly as much noise as I had thought.

This demo crew approached this project with precision and also seem to be quite safety-conscious, as one man serves as a type of ‘director’, giving a lot of hand signals to the shovel operator…and he also has a piercing whistle to let the shovel operator know when to stop.

It’s quite apparent they’ve worked together many times in the past.

* * *

I’ve taken many, many more images…and Monday’s group has not even been re-sized, so I’ll try to get them up as soon as I can.

I seem to be the only photographer cataloging this demolition, as I’ve seen only two others who only took a few shots, then walked away.

In my mind, cataloging is extremely important historically…we must be able to ‘know what things were like along the way’ in order to make a better life for future generations.

Ultimately, I’ll process all the images and turn them into a video slide show and, perhaps, present it to Tawani Enterprises, Inc. to commend them for all the good things they are doing for the Rogers Park neighborhood.

It has begun!

I’ve been working pretty hard this week, getting walls and ceilings primed with stain blocker and applying the finish coat of paint…but the REAL work has begun next door, with the first bit of demolition of the Shambhala Meditation Center!!!

A crew began constructing the surrounding fence on the property shortly after noon.

A crew began constructing the surrounding fence on the property shortly after noon.

 

Just before 2:30, the shovel fired up and clawed down a metal cable tube...

Just before 2:30, the shovel fired up and clawed down a metal cable tube…

 

...then began the tear-down in earnest on a rear addition of the building.

…then began the tear-down in earnest on a rear addition of the building.

 

Bricks went flying, the pile of rubble growing by the minute!

Bricks went flying, the pile of rubble growing by the minute!

 

I rushed down to street level, taking a shot from the parking lot...

I rushed down to street level, taking a shot from the parking lot…

 

...then walked around to the rear of the building, where the shovel was already shut down before 3:30 PM!

…then walked around to the rear of the building, where the shovel was already shut down before 3:30 PM!

One man, one shovel…managed to take down the addition in less than an hour (image taken at 3:22 PM)!

That’s what I call efficiency!

After speaking with one of the fence constructors, who has worked for Tawani Enterprises (chaired by Col. J. N. Pritzker), I have no knowledge if work will continue over the weekend or hold off until Monday…but I’ll be here, photographing as much as I possibly can.

The best thing, at this point?  That ugly halogen vapor light, which illuminated my apartment every evening for the past 4+ years, is OFFpermanently!!!